Hey everyone,
I am looking to see if there are any script (qscript or sql) that I can manipulate the stagger times. I have a very large environment and some of my VSA jobs fail because of the number that start at the same time and AD authentication becomes an issue. I would like to stagger them by 8 to 10 seconds. I know the GUI setting but need to see if I can script the changes so I dont have to touch every single schedule.
Thanks!